What Concrete Sidewalk Replacement Involves in Paterson, NJ
A sidewalk is public ground, so the city has a say at every stage. Eight steps cover a replacement from the permit to the first footsteps, and none of them is optional on a frontage:
- Permit comes from the Streets Division Superintendent before any panel is opened or removed.
- Dig Number from New Jersey 811 clears buried lines before the saw cuts.
- Removal takes out cracked panels, roots that lifted them and the tired base below.
- Stone base is compacted in layers so each panel sits level and drains.
- Forms hold a width of at least 5 feet and the slope toward the curb.
- Tree strip leaves an unpaved gap 2 1/2 feet wide beside any living tree, with the length set by the Superintendent.
- Pour is concrete only, since bluestone and concrete may not share one sidewalk.
- Driveway crossing gets reinforced concrete built to the city’s standard specifications.